Fig. 9:
Mounting height of the device carrier and the
flush-mounted box
2. Insert the cable through a suitable hole in the flush-mounted box.
3. Insert the enclosed plaster cover as protection against the plaster.
Note
Ensure that no cavities are created, to prevent heat bridges from forming. Fill
any existing cavities with suitable insulation material.
After the insulation and plastering:
4. Carefully remove the plaster located over the box.
Note
Ensure that a sufficient amount of plaster remains so that the hole can later be
completely covered by the encircling collar of the flush-mounted installation box.
Fig. 10:
Inserting the installation box and outdoor
station
System Manual 2CKA000073B9795
Overview of product range
Note
Ensure that the installation height of the
device carrier and the flush-mounted
box matches the thickness of the
planned exterior insulation (e.g. 160
mm exterior insulation).
5. Insert the flush-mounted installation
box [C] into the flush-mounted box
and tighten it with the enclosed
screws.
For this, use the four elongated
holes in the bottom of the flush-
mounted installation box.
Use the shorter or longer screws
depending on the thickness of the
plaster.
6. Connect the outdoor station [D] and
insert it into the flush-mounted
installation box [C].