Function Diagrams For Marker Synchronization; Syncstart To A Running Master After Power On; Marker Correction During Operation; Figure 23: Initial Start-Up With Marker Synchronization - Danfoss VLT 5000 Operating Instructions Manual

Synchronizing controller
Hide thumbs Also See for VLT 5000:
Table of Contents

Advertisement

Function diagrams for marker synchronization

SyncStart to a running master after Power ON

If the slave is synchronized to a running master drive, the slave automatically synchronizes its position
to the master. After at least one slave marker and one master marker have been detected, the marker
compensation comes into effect.

Marker correction during operation

During operation, marker correction is always carried out when the markers is detected. This ensures
optimum synchronization, no matter whether the gear ratios are not accurate or there is a slip.
60
Synchronizing controller

Figure 23: Initial start-up with marker synchronization

MG.10.N4.02 - VLT is a registered Danfoss trademark

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VLT 5000 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Vlt 5000 flux

Table of Contents