Once the packing material has been removed, check the machine visually for integrity and make sure there are no
damaged parts.
Keep the packing materials out of the reach of children as they can be a source of danger.
N.B. Keep the packing for possible future transport.
7
7.1
Chose the installation site according to the current rules on Safety at Work.
The floor shall not be uneven as to grant stability to the machine.
Outdoor installation requires a weatherproof roof.
The working area must be in accordance to the following requirements:
-
relative humidity from 30% to 95% without condensate;
-
temperature between 0° and 55°C.
2
IT IS FORBIDDEN to use the machine in explosive atmosphere.
A
7.2
Overall dimensions of this machine are 2600x3150mm. considering a min. distance from walls as shown in Fig. B/4.
Make sure the ceiling is at least 3m. high.
ATTENTION! The dimensions above also refer to the working area. Bystanders and persons other than
trained and authorized staff are strictly forbidden to enter this area.
Set the forks of the lift truck into the slots 1 and 2 made in the machine baseframe expressly to move it and set it
in position.
It is, furthermore, possible to use the hooks placed at the machine corners and those on the chuck carriage (fig. A,
ref. 3,4,5,6), by means of lifting bands having adequate capacity (see technical data, page 4). Keep the hooks for
any further need of moving the machine to a new installation site.
Recommended fork lift truck requirements: 2000 kg. min. lifting capacity; 1300 mm. fork length.
It is not essential to anchor the machine to floor. Just make sure it is well stable and set shims wherever levelling is
necessary. This will grant good operating process after setting the machine at work. Set shims wherever necessary
and use the proper fastening holes.
B/4

UNPACKING

INSTALLATION

INSTALLATION SITE

WORKPLACE REQUIREMENTS