2.5
Cabinet Installation and Earth Grounding setup
Follow these steps to setup your TPC system, and pay attention to the ground pin
which should be connected to the earth/ground. TPC system should give the best
performance for EMI immunity, ESD immunity, Surge immunity and also system iso-
lation. If the TPC system is embedded in the cabinet, the TPC system's ground, cab-
inet's ground and earth/ground should be connected together.
1.
Install the TPC system into the cabinet.
Step A: Connect the cabinet to the earth/ground.
Step B: Embed null TPC system into the cabinet without any I/O cable and power.
2.
System wiring.
Step A: Connect the cabinet to the earth/ground.
Step B: Ensure that all cabinets have been grounded together.
Step C: Connect the ground of the power supply to the cabinet.
Step D: Connect the ground pin of TPC system to the cabinet.
15
TPC-xx51T-x3BE User Manual