Maintenance - Siemens KMS Assembly And Operating Instructions Manual

Vertical mill gear unit sizes 225 to 850
Table of Contents

Advertisement

10.7

Maintenance

Maintenance comprises all measures for preserving the required condition.
Table 16: Maintenance measures
Measures
The proper function and
measurement accuracy of the
ignition protection system for the
temperature monitoring should be
checked at regular intervals
according to the instructions of the
manufacturer of the ignition
protection device
First oil change after start-up
Oil analyses
Subsequent oil changes
Clean the gear unit
Clean the air filter
Replacing the air filter cartridge
Checking tightness of the foundation
bolts
General inspection of the gear unit
Maintenance work on the oil-supply
system
Check couplings
DANGER
Electrostatic discharge
Danger to life from ignition of present explosive atmosphere by electrostatic discharge.
The coating must not carry an electrostatic charge.
The operator must ensure that highly effective mechanisms which can set up a charge in the coating
are safely avoided.
Periods
see instructions of the
manufacturer.
after approx. 1000 operating hours
or depending on the results of the
oil analysis carried out
first one after 1000 operating
hours, all subsequent ones
annually
depending on the oil analysis
results; (without oil analysis: at the
latest after 18 months and/or
10000 operating hours)
as required, at least every 2 years
every 3 months
annually or when the air filter is
heavily soiled.
every 12 weeks
every 2 years
see also operating instructions
oil-supply system.
every 6 months
BA 9137 en 12/2015
78 / 89
Remarks
The operator must ensure this.
See item 10.7.2
See item 10.7.1
See item 10.7.2
See item 10.2.
10.3
See item
.
See item 10.3.1.
See item 10.7.3
See item 10.11
See also operating instructions
oil-supply system.
See operating instructions
individual components.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents