Structure And Installation; Pm200 Master Power Unit - Projecta INTELLI-RV PM200 Instruction Manual

12v power management system
Hide thumbs Also See for INTELLI-RV PM200:
Table of Contents

Advertisement

3. STRUCTURE AND INSTALLATION

3.1 PM200 Master Power Unit

Table 5 Connection of PM235
N
O
LABEL
1
AC Mains
2
Switch panel
3
LCD Display
4
Battery switch
5
Fresh water tank 1
6
Fresh water tank 2
7
Tap water tank
8
Waste water tank
9
Battery sensor
10
PV+
11
PV-
12
Starter Bat+
13
Service Bat+
14
Starter Bat-
15
Service Bat-
16
L1+
17
L2+ ~ L3+
18
L4+ ~ L10+
19
L11+
20
L12+ ~ L14+
21
L1- ~ L14-
22
D+ Point
23
Remote Switch
24
Select Switch
25
Setting
26
Fuse
Figure 8 Front panel of PM235
DEFINITION
DESCRIPTION
AC input port
Comm port
Connect to switch panel
Comm port
Connect to monitor
(Monitor is not available in PM200)
Service battery switch
Manual battery switch
Connect to fresh water tank 1
Fresh water tank 2 is not available in PM200
Connect to tap water tank
Connect to waste water tank
For temp compensation
Connect to service battery+
Solar input
Connect to PV+
Solar input
Connect to PV-
Starter battery+
Connect to starter battery+
Service battery+
Connect to service battery+
Starter battery-
Connect to starter battery-
Service battery-
Connect to service battery-
Step
Connect to load of class D
Connect to load of class C
Connect to load of class B
Water pump
Connect to Water pump+
Connect to load of class B
Connect to DC load -
D+ input
Connect to D+
Terminal block
Connect to remote switch
Dip switch
Select local switch or remote switch
(Note: open the upper cover board to operate)
Dip switch
Set the battery type and capacity
(Note: open the upper cover board to operate)
Fuses and fuse failure indication
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents