Checking Channel Attachment - Hp-Ux - IBM 3592 Maintenance Information

Rack mount models
Hide thumbs Also See for 3592:
Table of Contents

Advertisement

16. At the Enter Block Size: prompt, type 1024.
17. At the Enter Blocking Factor: prompt, type 256.
18. At the Enter Megabytes to Write: prompt, type 10. The response is -
********************************
********
Transferred 10MB in 2.19 seconds for rate of 4.69MB/second.
19. At the Enter Selection: prompt, select 15 to rewind the tape. The response is -
The STIOC_TAPE_OP ioctl succeeded.
20. At the Enter Selection: prompt, select 2 to close the device. The Device Closed response is
displayed.
21. At the Enter Selection: prompt, select Q to exit the tapetest program.

Checking channel attachment - HP-UX

The devices must be fully installed and the host device driver must be configured and available. See IBM
SCSI Tape Drive, Medium Changer, and Library Device Drivers: Installation and User's Guide for
information about installing and configuring the IBM tape drive. Also, "Installation and Configuration
Instructions" in the guide describes the smit and cfgmgr commands.
Refer to the Host Attachment Example diagram for an example of the software and hardware paths that
are used in the following tests. The figure illustrates unique initiator addresses for a configuration with
more than one initiator that shares a SCSI bus.
232 IBM 3592 TS1140, TS1150, TS1155, and TS1160 Tape Drives: Maintenance Information

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts1140Ts1150Eh7Ts1160Ts1155Eh8 ... Show all

Table of Contents