Commissioning; Function Check - Endress+Hauser Liquiphant FTL33 IO-Link Operating Instructions Manual

Point level switch for liquids in the food sector
Hide thumbs Also See for Liquiphant FTL33 IO-Link:
Table of Contents

Advertisement

Commissioning

Designation
Application Specific
Tag
Actual Diagnostics
(STA)
Last Diagnostic (LST)
9.2.3
System commands
Designation
Reset to factory settings (RES)
Device Access Locks.Data Storage Lock
10
Commissioning
10.1

Function check

Prior to commissioning, make sure that the post-installation and post-connection checks have
been performed.
See:
• "Post-installation check" checklist
• "Post-connection check" checklist
30
ISDU (dec) ISDU (hex)
24
0x0018
260
0x0104
261
0x0105
Size (byte) Data type Access Default value
32
String
4
String
4
String
ISDU (dec)
ISDU (hex)
2
0x0002
12
0x000C
Liquiphant FTL33 IO-Link
r/w
r/-
r/-
Value range
130
0 ~ False
2 ~ True
Endress+Hauser
Data
storage
Access
-/w
r/w

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents