How To Take All The Zones Out Of Test Across A Network - EMS FirePoint 5000 Step-By-Step Manual

Hide thumbs Also See for FirePoint 5000:
Table of Contents

Advertisement

EMS 5000 FIREPOINT
11
Press  key two times and the screen will
display:
12
Press Yes key and the screen will now
display:
13
Press  key six times and the screen will
display:
14
Press Yes key and the screen will now
display:
15
Press  key three times and the screen will
display:
16
Press Yes key, the screen will stay the same
but the test LED will start flashing to show
that all the zones are in test.
NOTE: Check the other panels to make sure the test LED is flashing to
ensure no Sounders/Relays will activate.

14. How To Take All The Zones Out Of Test Across A Network

How to take all the zones out of test across a network (depending on software
version) on the 5000 FirePoint. Insert the key into the panel controls
keyswitch, located at the right of the panel.
Step
No
1
Turn the key to the on position and the
screen will display:
2
Press 0 key and the screen will now display:
3
Press  key four times and the screen will
display:
©2015 EMS Security Group Ltd. All rights reserved.
Action
25
|Mimic
>Advanced
|^^^^^^^^^^^^^^|
Yes= Select
|*** Advanced ***|
>Get Slave Bus Lsts <
|^^^^^^^^^^^^^^^|
Yes= Select
|Local Mimic
>Set Zones
|Announce All Clear |
Yes= Select
|* Set All Zones * |
>SINGLE
|ALL
Yes= Select
|TWO PHASE
>TEST
|ISOLATED
Yes= Select
|TWO PHASE
>TEST
|ISOLATED
Yes= Select
Screen Display
Panel in Access
Date
|** Fire system **|
>Dev. Isolate/Test<
| Net. Isolate/Test |
Yes= Select
|Brigade Isolate |
>Engineers Config<
|Printer Options |
Yes= Select
TSD258 Iss 3 25/06/15 AJM
|
<
Time
Time
|
<
Time
<
|
Time
|
<
|
Time
|
<
|
Time
Time
Time
Time

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents