Hood Type & Platen Height; Lonworks Information & Commissioning To Activate The Grill Onto The Lonworks Network - Garland MWE2W Installation, Operation & Service Manual

1 & 2 platen electric & gas clamshell grills with product recognition
Table of Contents

Advertisement

GARLAND CLAMSHELL GRILLS WITH PRODUCT RECOGNITION
INSTALLATION & STARTUP
Connect the hose and ensure the sleeve snaps fully
forward against the retaining ring.
With the manual shut-off valve closed, install the
other end of the hose to the gas supply. If the grill
is equipped with an optional front gas connection,
see the sub-section titled, "Front Gas Connection" on
the following page for dimensions and positioning
information.
8. Install fl ue box to back of grill for single or double
platen (If required).
FOR GAS GRILLS ONLY
FLUE BOX CLIPS ON REAR LIP OF
GRILL & IS CENTERED SIDE TO SIDE
9. Install grease bucket rails as shown below:
.750
PART #4527466 (12 Aug 2011)
(continued)
10. Roll grill under hood. Grill must be level front to back,
Hood Type & Platen Height
With the platens in the raised position, measure the height
from the front edge of the platen to the grill surface. If the
platen height is over 17" (431mm), it must be adjusted to
FLUE BOX IS NOT SUPPLIED
BY THE MANUFACTURER
proper clearance by an authorized service agent.
ATTACH SHUT-OFF
STICKER IN THIS
LOCATION
LonWorks Information & Commissioning
To Activate the grill onto the Lonworks
network:
To enable the power line communications between the
grill and the Lonworks network the grill must fi rst be
commissioned onto the network.
INSTALLATION/OPERATION & SERVICE MANUAL - 1&2 PLATEN
GREASE BUCKETS & RAILS NOT
SUPPLIED BY MANUFACTURER
side to side and diagonally. Adjust casters accordingly
to obtain fi nal level.
17in
[431
]
MAX
45°
RAIL
GREASE BUCKET
Page 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mwe2sMwg1wMwg2wMwe1wMwe1s

Table of Contents