ProMinent delta General Operating Instructions page 16

Solenoid metering pumps
Table of Contents

Advertisement

Installation, hydraulic
With fluctuating suction-side pressure 2
P_MAZ_0010_SW
Fig. 24
With negative pressure in the main line
P_MAZ_0010_SW
Fig. 25
With danger of deposits in the liquid end
Fig. 26: Manual flushing equipment
3
Fig. 27: Automatic flushing equipment
16
If the system is primed from a high feed level with fluctuating pressure,
n
use a hopper with a float valve to ensure a regular discharge flow.
When metering into a main line, in which there is negative pressure,
n
install a multifunctional valve, a back pressure valve (DHV-RM) or an
injection valve in the discharge line to ensure that the feed chemical is
not sucked through.
When metering suspensions, use flushing equipment (see Product
n
Catalogue Chapter 1.8) to prevent deposits in the liquid end.
1
Rinsing water
2
Flushing equipment
1
2
P_MAZ_0019_SW
There are two versions of flushing equipment:
Manual flushing equipment
n
Automatic flushing equipment
n
There are two flushing principles:
1
Flushing when metering is interrupted (intermittent flushing)
n
2
Flushing when metering is finished.
n
P_MAZ_0020_SW
CAUTION!
Problems may arise if flushing cannot be performed cor‐
rectly.
Ensure that the metering pump is idle during flushing.
Do not exceed the maximum permitted flushing pressure
of 2 bar!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gamma/ lBeta

Table of Contents