Security Measures; Installation Tools - Zte ZXCBTS Series Installation Manual

Cdma micro base transceiver station & rf remote station
Table of Contents

Advertisement

ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
lightning rod/lightning grounding point/outdoor cabling rack, the firmness and
wind-resistant ability of the pole meet the design requirements. In addition, check if the
necessary tools and assisting materials are prepared, and if the route for laying the
primary feeder cable are determined through negotiation.
The equipment provider presents the requirements on the installation of the antenna
mount based on the structure and size of the antenna, and the network operator should
install the antenna mount as required.
The network operator is also responsible for the installation of the outdoor cabling rack,
lightning rod, lightning grounding point and outdoor lightning grounding cable.
Moreover, the network operator needs to drill holes on wall or rooftop for installing the
feeder cable window as one of the equipment room conditions.

9.1.3 Security Measures

The installation personnel working at heights must wear the safety belt, and
those working on ground must wear the safety helmet. They must wear
working clothes and shoes causing no slips when climbing up the tower.
1.
2.
3.

9.1.4 Installation Tools

1.
2.
3.
4.
Caution:
Safety precautions should be stressed to the installation personnel.
The outdoor installation should be conducted in sunny days without strong wind.
Obvious signs should be set in the installation site to notify irrelative people to
keep away from the site. The installation personnel working on ground are
obligate to keep irrelative people, esp. children away from the site. The tools
used on the tower and some metal components might slip to cause casualties, so
they must be put in a canvas tool bag when not used, and the bag must be sealed
immediately after you open it for a tool or component.
Measurement tools: A compass, multimeter, inclinometer and tape measure;
Communication tools: Two mobile phones;
Raising tools: Pulley and rope;
Special tools: Cutter for cutting primary feeder cables and tools for assembling
connectors;
9-2

Advertisement

Table of Contents
loading

Table of Contents