Preparations; Installation Environment Check; Checking Equipment Building Conditions; Checking Indoor Environment - Zte ZXCBTS Series Installation Manual

Cdma micro base transceiver station & rf remote station
Table of Contents

Advertisement

2 Preparations

2.1 Installation Environment Check

The items to check:

2.1.1 Checking Equipment Building Conditions

Check if the layout, height, bearing capability, shock-proof ability, doors and windows,
walls and troughs of the equipment building meet the requirements.

2.1.2 Checking Indoor Environment

Check the temperature, humidity, air pressure, ventilation condition, antistatic
protection measures, anti-interference measures, dustproof measures, rodent-resistant
measures, fire-protection facility, lighting condition, water supply and drainage system
of the equipment room.
To the highest priority, the equipment should be installed on the cool and dry walls
indoors with good ventilation; the fire-protection facility should be equipped; there
should be no caustic gas or smog in the room and no leakage on the roof; the
electromagnetic interference strength should be no more than 140dBµV/m
(0.01MHz~110000MHz). Or the equipment can be installed on the shady walls
outdoors with good ventilation and rain blocks. To the least priority, the equipment can
be installed on common walls, towers or high poles. The operating temperature range
of the equipment is between -40°C and +55°C, and the relative humidity range is
between 5% and 100%.
Summary
Describing the installation environment check.
Listing the installation tools.
Listing
installation.
the
technical
2-1
documents
needed
for

Advertisement

Table of Contents
loading

Table of Contents