Fig. 6.2-3 Structure Of A Grounding Kit - Zte ZXCBTS Series Installation Manual

Cdma micro base transceiver station & rf remote station
Table of Contents

Advertisement

6.2.3.2 Procedures to Install a Grounding Kit
1.
2.
Grounding terminal
3.
4.
Prepare such tools as paper knife, straight screwdriver, spanner and sharp nose
pliers.
Choose a suitable position for installing the grounding kit, and cut the sheath off
the 7/8" feeder cable based on the size of the grounding kit. The structure of a
grounding kit is shown in Fig. 6.2-3.
Feeder cable
Grounding cable

Fig. 6.2-3 Structure of a Grounding Kit

Lead the grounding cable of the lightning grounding kit to the grounding net.
Keep the angle between the grounding cable and the primary feeder cable no
more than 15°.
If the antenna feeder system is installed on a tower, lead the grounding cable
downward along the tower.
If the antenna feeder system is installed on the top of a building, lead the
grounding cable to the lightning protection net.
Before installing the grounding kit, wrap the waterproof adhesive tape around
the grounding cable near the grounding copper for sealing, as shown in Fig.
6.2-4.
Chapter 6 Installation of Grounding System
6-5
Grounding wire clip
Out-layer copper
core of feeder cable
Sheet copper of
feeder cable

Advertisement

Table of Contents
loading

Table of Contents