Installing Ups; Fig. 13.3-4 Layout Of The Monitoring Cables Of The Cdma Micro-Bts 485/Dry Contact - Zte ZXCBTS Series Installation Manual

Cdma micro base transceiver station & rf remote station
Table of Contents

Advertisement

ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual

Fig. 13.3-4 Layout of the Monitoring Cables of the CDMA Micro-BTS 485/Dry Contact

Here three interfaces, namely POWER, MONITOR and SDH-POWER are related to
the external UPS.
Where,
One cable end of POWER interface is connected with the POWER interface, and the
other end is a standard 3-core power plug. To connect with the UPS, the 3-pin plug
should be cut off first, then the three core wires (yellow-green, blue and brown,
corresponding respectively to the ground line, neutral line and live line) should be
connected with the output terminal of UPS properly;
For the cable connection of the MONITOR interface, refer to the above-mentioned
from-to-list.
One end of the cable for the SDH-POWER interface is connected with this interface,
and the other with the secondary power-off output connecting terminal of UPS, with
the red and blue core wires connecting with the -48V, and the black and yellow-green
ones with the ground.

13.3.5 Installing UPS

As a product of ZTE, the ZXUPSL010 is delivered with the proper user's manual
Connected together with the
front-door grounding cable
Bottom MONOTOR
13-14
MTPB1 lightning-
protection board

Advertisement

Table of Contents
loading

Table of Contents