11.3 Checking Cables

Check if:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. All cables are stuck with labels indicating the usage, and the contents in the
11. Stick the labels with transparent adhesive tape to prevent them from falling off.

11.4 Checking Power Cables and Grounding Cables

Check if:
1.
The cable outlet at the bottom of the cabinet has been covered with the cover
plate after the cables are connected.
The combined cabinets are arranged in order and the connecting pieces on the
top of the cabinets are fastened firmly.
The surface of the cabinet is clean, the paint has no blemishes, and various
indications on the surface are correct, clear and complete.
The front door can be opened or closed flexibly.
All cables are laid straight and there are no cross-connections. Surplus cables are
coiled, bundled and put in the cabling trough.
The cables are turned smoothly.
Power cables and signal cables are laid separately with a distance of more than
150mm.
All cables are labeled clearly at both ends to avoid wrong or missed connections.
The joints are reliable and well contacted without breaks or bends.
The cables are tied with proper tightness, and the cable ties are distanced evenly.
Surplus part of the cable ties for indoor cables has been cut.
Some margin is reserved when the cable ties used on outdoor cables are cut.
No cable tie has spininess part after being cut.
labels at both ends are the same.
The cabling of power cables and grounding cables conforms to the design
requirements.