Programming; General Information; Basic Programming - Pentair Siata V132 SFE Installer Manual

Table of Contents

Advertisement

6.

Programming

6.1.

General information

In battery-operated mode, regeneration is not carried out and the parameters cannot be edited;
The SFE controller allows you to manage your installation via clock control or volumetric control.
The controller will automatically initiate regenerations cycles based upon the programmed
regeneration mode and the programmed parameters;
The SFE controller offers the possibility to manually start regeneration simply by pressing the
regeneration button, as well as initiate a regeneration from an external signal;
The controller is able to receive an external signal for inhibition of regeneration cycles, that will
block any regeneration start as long as the inhibit signal is received by the controller;
The SFE controller can manage a chlorine production cell that will be activated during the brine
draw cycle of the regeneration.
A
Note
The SFE controller is available with 2 different electronic boards:
- Standard 7930-23 : this board allows to program a dry contact relay.
- Chlorine cell control 7930-24 : this board allows to drive a chlorine producer.
Both electronic boards are delivered with the same software.
6.2.

Basic programming

A
Note
To access the basic menu, press and release the
A
Note
Menus are displayed in a defined and incremental order.
A
Note
While the parameters are being edited, the regeneration icon is on and flashing.
Hour format setting
Set your format settings as 12 or 24 hours.
A
Use
and
to edit this parameter.
B
Press
to validate and switch to the next parameters.
Current time
Set the current time displayed.
A
Use
and
to edit this parameter.
B
Press
to validate and switch to the next parameters.
Ref. MKT-IM-003 / B - 19.04.2017
Installer manual Siata V132 - SFE - Programming
button.
45 / 88

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siata v132 sfe

Table of Contents