Installation; Safety; General Safety Instructions; Instructions, Standards And Regulations - STIEBEL ELTRON PEO 18 Operation And Installation

Electronically controlled instantaneous water heater
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

INSTALLATION

Safety

INSTALLATION
7.
Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
7.1

General safety instructions

We guarantee trouble-free function and operational reliability only
if original accessories and spare parts intended for the appliance
are used.
Material losses
!
Observe the maximum inlet temperature. Higher tem-
peratures may damage the appliance. You can limit the
maximum inlet temperature by installing a central ther-
mostatic valve.
7.2

Instructions, standards and regulations

Note
Observe all applicable national and regional regulations
and instructions.
- The IP 25 (hoseproof) rating can only be ensured with a cor-
rectly fitted cable grommet.
- The specific electrical resistance of the water must not fall
below that stated on the type plate. In a linked water net-
work, observe the lowest electrical water resistance (see
chapter "Specification / Application areas / Conversion table").
Your water supply utility will advise you of the specific electri-
cal resistance or conductivity of the water.
8.

Appliance description

8.1

Standard delivery

The following are delivered with the appliance:
- Wall mounting bracket
- Threaded stud for wall mounting
- Installation template
- 2 twin connectors (cold water with shut-off valve)
- Flat gaskets
- Cable grommet (power cable from above / below)
- Screws / rawl plugs for securing the back panel to allow for
water connection on finished walls
For appliance replacement:
- 2 tap extensions
6
| PEO 18/21/24 | PEO 27
9.

Preparations

9.1

Installation site

Material losses
!
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically and near the draw-off
f
point.
The appliance is suitable for undersink and oversink installation.
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
f
a sufficient load-bearing capacity.
1
2
1
www.stiebel-eltron.com

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Peo 21Peo 24Peo 27Pey 18Pey 21Pey 24

Table of Contents