Mounting - DEMA CPM 310 G User Manual

Digital overcurrent protection relay
Table of Contents

Advertisement

Mounting

The following pages describe the mounting of CP 310 G case – for CPM 310 G relays are designed
with draw-out system, the internal and external units can be handled independently during the
mounting and cabling processes.
PANEL CUT-OUT
Flush mounting requires processing of the panel – the drawing below gives dimensions needed for the
cut-out. The dimensions on the drawing are determined taking standard electrostatic coating
thickness into consideration.
If the cut-out is processed at the panel manufacturing stage, please prepare the cut-out with the
dimensions given below. Electrostatic coating thickness will not prevent the correct mounting of
the case.
If the cut-out is to be processed on an existing panel; please prepare the cut-out with the
dimensions given below, and pay heed to these instructions:
The cut-out edges and the mounting holes should be fine treated after the cutting process
o
to prevent the case coating from scratching and to perform a level mounting.
The cut-out edges should be treated with anti-corrosive coatings and paint against
o
oxidation. ↺
Cut-out Drawing
- 36 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents