3. How to Install
3
Illustration 3.53: Completely assembled bottom
duct work
38
The duct assembly is used to mark the bottom
cutout. Temporarily install the bottom duct
work as shown to the right. Use the inside of
the ductwork to mark the bottom of the en-
closure for the opening.
MG.11.F1.02 - VLT
®
is a registered Danfoss trademark
®
VLT
HVAC DRIVE High Power
Operating Instruction