3. How to Install
3
Illustration 3.9: Position of power connections - Disconnect
Be aware that the power cables are heavy and hard to bend. Consider the optimum position of
the frequency converter for ensuring easy installation of the cables.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
Table 3.1: Cable positions as shown in drawings above. Dimensions in mm (inch).
20
IP 21 (NEMA 1) / IP 54 (NEMA 12)
Enclosure D1
Enclosure D2
277 (10.9)
379 (14.9)
227 (8.9)
326 (12.8)
173 (6.8)
273 (10.8)
179 (7.0)
279 (11.0)
370 (14.6)
370 (14.6)
300 (11.8)
300 (11.8)
222 (8.7)
226 (8.9)
139 (5.4)
142 (5.6)
55 (2.2)
59 (2.3)
354 (13.9)
361 (14.2)
284 (11.2)
277 (10.9)
334 (13.1)
334 (13.1)
250 (9.8)
250 (9.8)
167 (6.6)
167 (6.6)
261 (10.3)
260 (10.3)
170 (6.7)
169 (6.7)
120 (4.7)
120 (4.7)
256 (10.1)
350 (13.8)
308 (12.1)
332 (13.0)
252 (9.9)
262 (10.3)
196 (7.7)
192 (7.6)
260 (10.2)
273 (10.7)
MG.11.F1.02 - VLT
®
is a registered Danfoss trademark
®
VLT
HVAC DRIVE High Power
IP 00 / Chassis
Enclosure D3
Enclosure D4
119 (4.7)
122 (4.8)
68 (2.7)
68 (2.7)
15 (0.6)
16 (0.6)
20.7 (0.8)
22 (0.8)
363 (14.3)
363 (14.3)
293 (11.5)
293 (11.5)
215 (8.4)
218 (8.6)
131 (5.2)
135 (5.3)
48 (1.9)
51 (2.0)
347 (13.6)
354 (13.9)
277 (10.9)
270 (10.6)
326 (12.8)
326 (12.8)
243 (9.6)
243 (9.6)
159 (6.3)
159 (6.3)
261 (10.3)
261 (10.3)
170 (6.7)
170 (6.7)
120 (4.7)
120 (4.7)
98 (3.8)
93 (3.7)
301 (11.8)
324 (12.8)
245 (9.6)
255 (10.0)
189 (7.4)
185 (7.3)
260 (10.2)
273 (10.7)
Operating Instruction