When the Audio Source is from the Playlist or Record, the Loop and Infinite Loop are
alternative options. When the Audio Source is AUX, it is no need to set these two
parameters.
When the Audio Source is from the Playlist or Record, the Play Full is active.
Emergency Task:
When the Audio Source is from the Playlist or Record, the Volume, Audition enable and
Record Enable in the Play Policy are no need to set, and you can set the other
parameters as you need. The Loop and Infinite Loop are alternative options.
When the Audio Source is from the AUX or Record, there only the Turn on Delay, Busy
Wait Enable, Interrupt Recovery and Priority are active.
When the Audio Source is from the PPT MIC, there only the Turn on Delay and Record
Enable are active.
The value range for the Priority is 201 ~255. When the Audio Source is from the PPT MIC,
the default value for the Priority is 255. It cannot be modified.
Zone & Group
Set the zones or groups to play the play task.
Output Dry Contact
Set the ports to output the play task. When the Volume Control Enable option is selected, all
the options of the Output Dry Contact are locked.
3.
Click OK button to complete.

Edit Play Task

To edit play task:
1.
Double-click the play task to edit in the Play Task Settings window as shown in the Figure 21,
the Edit Play Task window displays.
2.
Edit the parameters as you need.
3.
Click OK button to complete the edit.

Delete Play Task

To delete the play task:
1.
Select the play tasks in the Play Task Settings window as shown in the Figure 22.
2.
Click Delete button to delete the selected play tasks.
3.
Click OK button to exit the Play Task Settings window.

Add Task Series

To add the task series:
1.
Click Add button on the left of the window as shown in the Figure 21, the Add Series
Description window displays.
2.
Enter the task series description.
3.
Click OK button to return to the Play Task Settings window.
4.
Select the added play task series above.
5.
Select the play tasks to add to the Play Task Series Table.
6.
Click
is to delete the selected play task
is to move forward the selected play task
button, the selected play tasks show in the Play Task Series Table.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents