040 Service activities

ADSO Uninstall / install probe water level
ADDD Uninstall / install pressure valves steam boiler
 ABGL Uninstall / install appliance cover on the left side
1 Electric connectors
2 Probe water level
3 Nut
 Separate the electric connectors.
 Loosen the nuts.
 Pull out probe.
 ABGL Uninstall / install appliance cover on the left side
1 Nut
2 Electric socket plug connections
3 Solenoid valves
Duo
 Separate the electric connectors.
 Loosen the nuts.
 Unscrew the solenoid valves.
Note
Solenoid valves are only offered as a complete spare part.
English 5.906-590.0 Rev. 01 (05/17)
37