Addk Uninstall / Install Steam Boiler - Kärcher SGV 6/5 Service Manual

Hide thumbs Also See for SGV 6/5:
Table of Contents

Advertisement

ADDK Uninstall / install steam boiler

 ABGL Uninstall / install appliance cover on the left side
 ADDD Uninstall / install pressure valves steam boiler
 ADSO Uninstall / install probe water level
 ADAT Open / close carrier
1 Electric connectors
2 Nuts
3 Hose clip
 Separate the electric connectors.
 Loosen the nuts.
 Loosen the hose clip.
1 Covers
2 Nuts
3 Covering plate
 Remove covers.
 Loosen the mounting nuts.
 Remove steam boiler.
44
English 5.906-590.0 Rev. 01 (05/17)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sgv 8/5

Table of Contents