CHAPTER 16 SOAK TEST AND PREPARE TO SHIP
Soak Test
Once
SMARTBOX
has been assembled, allow it to run 24 to 48 hours. At the end of the run, perform a
functional test to ensure all components are working as they should be.
Prepare to Ship
Once the soak test has been completed, the unit is ready to be disassembled and packed for shipping to the
customer site.
1. Unplug power sources, LNBF cables and data cables. Package the cables to include in the shipping box.
2. Remove power supplies from the chassis.
CAUTION:
Power supplies must be shipped outside the chassis. Leaving them in the chassis could damage the
power supplies or backplane.
3. Remove antenna from SMA connector; wrap it securely.
4. Pack the chassis in original box.
5. Add cables, power supplies, cellular antenna and other accessories to the box. Close the box and tape
it securely.