Figure 3-3 Top Shroud Disassembly - Emerson Daniel 3818 Maintenance And Troubleshooting Manual

Lng liquid ultrasonic meter for cryogenic liquefied natural gas applications
Hide thumbs Also See for Daniel 3818:
Table of Contents

Advertisement

Section 3: Meter maintenance
January 2018

Figure 3-3 Top shroud disassembly

A. Top shroud
B. Top shroud support
C. Top shroud support spacer
D. Top shroud end
Procedure
1.
2.
3.
4.
5.
40
Remove the customer-installed external thermal insulation from the meter body, the
rigid and flexible conduit, the LB conduit, and pipe standoffs (see
Important: Be sure you follow the manufacturer's safety instructions when handling
and storing the thermal insulation.
Place the thermal insulation away from the immediate work area.
Use a 7/16 inch wrench to loosen and remove the six top shroud hex head bolts and
lock washers from the top shroud.
Use a 1/2 inch wrench to loosen and remove the four hex head bolts and washers from
the top shroud ends.
Remove the top shroud assembly.
Maintenance and Troubleshooting Manual
A.
B.
C.
D.
Figure 3-2
Removing the band shrouds
3-9000-772 Rev B
).

Advertisement

Table of Contents
loading

Table of Contents