Mitsubishi Electric FDF71VNXVD Technical Manual page 27

Hyper/micro inverter packaged air conditioners floor standing type
Hide thumbs Also See for FDF71VNXVD:
Table of Contents

Advertisement

※46
113
55
C
50
15
970
190
580
200
60
60
60
15
E
262
388
D
Symbol
Content
B
Service valve connection of the
A
attached connecting pipe ( gas side)
Service valve connection ( liquid side)
A,G
B
C
Pipe/cable draw-out hole
D
Drain discharge hole
E
Anchor bolt hole
F
Cable draw-out hole
Connecting position of the local pipe. (gas side)
G
Terminal block
B
A
G
F
F
52
27
50
L3
Intake
L2
Intake
L1
Outlet
Service
space
C
Minimum installation space
Notes
(1) It must not be surrounded by walls on the four sides.
  (2) The unit must be fixed with anchor bolts. An anchor bolt must not
φ19.05 ( 3/4") ( Flare)
protrude more the 15mm.
  (3) Where the unit is subject to strong winds, lay it in such
φ9.52 ( 3/8") ( Flare)
a direction that the blower outlet faces perpendicularly
φ20×3places
to the dominant wind direction.
  (4) Leave 1m or more space above the unit.
M10×4places
  (5) A wall in front of the blower outlet must not exceed the units height.
φ30×2places ( front)
  (6) The model name label is attached on the lower right corner of the front.
φ45 ( side)
φ50 ( back)
(7) Connect the Service valve with local pipe by using the pipe of the attachment.
φ22.22 ( 7/8") ( Brazing)
(Gas side only)
(8) Mark ※ shows the connecting posotion of the local pipe. (Gas side only)
C
C
F
50
15
50
Examples of
installation
Dimensions
L1
Open
L2
300
L3
150
L4
L4
5
I I
I I I
Open
500
5
Open
300
150
5
5
Unit:mm

Advertisement

Table of Contents
loading

Table of Contents