Communication With The Cpu - Siemens TIM 1531 IRC Operating Instructions Manual

Telecontrol
Table of Contents

Advertisement

3. Click the "Import partner configuration" button.
Figure 4-4
The dialog for selecting the file with the configuration data opens
4. From the file system of the engineering station open the text file that you exported from
the proxy from the STEP 7 V5 project.
Figure 4-5
You can see the result of the import of partner data in the table "Partner stations".
In the "Imported configuration data file" output field, the file name of the imported SDBs is
displayed.
With the "Reset partner configuration" button you can delete the imported data again. The
partner-specific configuration data are then deleted.
Table "Partner stations"
This is where the data on the imported partner data is shown.
4.13

Communication with the CPU

Communication with the CPU
Using the first three parameters you specify the CPU access by the TIM in the CPU scan
cycle. You will find the structure of the CPU scan cycle in the section Read cycle (Page 115).
The fourth parameter "Frame memory size" decides the size of the send buffer of the TIM for
frames of data points that are configured as an event.
● Cycle idle time
Wait time between two scan cycles of the CPU memory area
● Max. number of write jobs
Maximum number of write jobs to the CPU memory area within a CPU scan cycle
TIM 1531 IRC
Operating Instructions, 02/2018, C79000-G8976-C468-02
Importing the configuration data
Selection of the file "sdbs_xxx.txt" with the configuration data from STEP 7 V5.
Configuration
4.13 Communication with the CPU
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents