4 Commissioning

4
Commissioning
4.1

Start-up program

8
Immediately after the power is connected, the start-up program will begin.
Various short items of information appear on the screen during start-up.
The following messages are displayed one after the other:
Display of the control panel version (
Display of the CU board software version (
Display of the CU board parameter version (
When the letters
are flashing on the display, then the phase and
neutral have been connected incorrectly. Swap the wires of the power
supply cable on the connection box.
Once the start-up program has run, the main display appears.
Important
If no key is pressed for 3 minutes, the standby screen appears
with the
and symbols.
Important
If a fault occurs during start-up, the
flashing error code on the display. The meaning of the error codes
can be found in the error table.
).
).
).
symbol appears with a
7698035 - v.01 - 19022018