Install On Pole; Figure 3-2 Install The Gps Antenna; Figure 3-3 Pre-Assembled Bracket - Baicells BRU35 Series Installation Manual

Outdoor lte tdd base station

Advertisement

Nova-243 Outdoor LTE TDD Base Station Installation Guide
The GPS cable should be as shorter as possible to reduce the influence to signal
strength.
The GPS has been assembled before packing, the only installation step is to fix the GPS
mounting bracket on the base station using the M4 x 14 screws, as shown in Figure 3-2.
3.4

Install on Pole

Required diameter of the pole: 30mm ~ 100mm and suggest the installation height
higher than 120cm.
The mount bracket has been assembled before packing, as shown in Figure 3-3. The
installation personnel only need to fix the assembled base station on the pole.
1.
Take down the two outer omegas.

Figure 3-2 Install the GPS Antenna

Figure 3-3 Pre-assembled bracket