Material Check, Unpacking And Preparation - Screen Innovations Sail Installation Manual

Table of Contents

Advertisement

MATERIAL CHECK, UNPACKING AND PREPARATION

NOTE:
Fixing elements such as screws and anchors are not included and must be
chosen by the installer based on the type of fixture foreseen (wall, wood, metal
etc.).
Proceed as follows:
- Remove the contents from the packaging.
Do not use a knife to avoid the risk of ruining the paint or metal elements or the
canvas fabric.
4 of 28
Warning:
all references to the right-hand or left-hand side in the assembly figures apply when
looking at the structure with the back against the shaped pole.
Warning:
The electrical system controlling the awning is the customer's responsibility and
must be installed by qualified personnel in compliance with current regulations.
SCREEN INNOVATIONS- INSTALLATION MANUAL- SAIL
RH
LH
Rev.1 - 03.2018

Advertisement

Table of Contents
loading

Table of Contents