PRELIMINARY CHECKS
On receipt of the packed goods and before starting their assembly, check the integrity of the
material and the presence of all the components necessary for the installation.
Carefully follow the information contained in the "Material check, unpacking and preparation"
section.
In case of anomalies immediately contact the authorised retailer or Screen Innovations
DISPOSAL OF PACKAGING MATERIALS
Divide the various packaging according to the material used (cardboard, nylon, polystyrene etc.)
and dispose of them separately in compliance with the regulations in force.
REASSEMBLY
IF THE AWNING HAS TO BE MOVED, IT MUST BE DISMANTLED AND PACKED AS ORIGINALLY RECEIVED. THEREFORE,
REPEAT ALL THE ASSEMBLY OPERATIONS IN REVERSE ORDER, TO AVOID LOSING THE SYNCHRONY OF MOVEMENTS
AND/OR DAMAGING COMPONENTS, SO THAT THE SUBSEQUENT REASSEMBLY OPERATIONS CAN BE
PERFORMED CORRECTLY AS DESCRIBED IN THIS MANUAL. SCREEN INNOVATIONS WILL NOT BE LIABLE FOR ANY
FAILURES ARISING FROM INCORRECT DISASSEMBLY.
Rev.1 - 03.2018
SCREEN INNOVATIONS- INSTALLATION MANUAL- SAIL
SYMBOLS
3 of 28