Screen Innovations Sail Installation Manual page 18

Table of Contents

Advertisement

ASSEMBLING THE ROLLER TUBE GROUP
Cut the two BLACK ties (A) binding the left side arm (B) SIMULTANEOUSLY.
NOTE: Two operators are required for this operation.
16 of 28
LH
B
RH
A
SCREEN INNOVATIONS - INSTALLATION MANUAL - SAIL
3
A
Release the spring clip (B) at the end of the rope (C) from the eyelet of the right-hand canvas (D).
D
B
C
Rev.1 - 03.2018

Advertisement

Table of Contents
loading

Table of Contents