Malaguti Blog 126 Service Manual page 49

Frame and running gear
Table of Contents

Advertisement

B l o g
B l o g
B l o g
B l o g
B l o g
125 - 160 cc
ACCESS
1) Three-phase stator
connectors
Regulator connector
2) Connector pick-up
3) Intermittence
4) Mass assembly
5) Electric fan relay
6) Injection system relay
7) Starter relay
8) Idle control valve
NOTE - Access to the various
mechanical componen-
ts can be deduced from
the illustrations.
1
F. 107
2
3
4
5
6
7
49
03/09
The reassembly stage of any interventions
on the wiring involves repositioning these as
illustrated, and fastening them with new
clamps that must be placed in the original
points.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blog 150

Table of Contents