Installing Ecg Board Assy - GE LOGIQ 400 Service Manual

Hide thumbs Also See for LOGIQ 400:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 5
8–5–6 Installing ECG Board Assy
1.
Turn the system power OFF and unplug the unit. Follow the OSHA Lockout/Tagout Requirements (29 CFR
1910.147, Direction 46–015902).
2.
Remove the Side Cover Right. Refer to 6–2–27 in Chapter 6, Renewal Parts.
Unscrew four screws ( 1 – 4 ) and remove the CONN panel 2.
3.
Keep removed screws because they are required to mount the ECG panel assy onto console.
Note
CONN PANEL 2 REMOVAL
ILLUSTRATION 8–58
8–53
TM
LOGIQ 400 SERVICE MANUAL
2127661
OPTIONS

Advertisement

Table of Contents
loading

Table of Contents