Daikin RMKS112LV1A Service Manual page 26

11.2/14.0/16.0 kw class 48000 btu/h class
Table of Contents

Advertisement

BP Unit
Step
4
Remove the sealing
materials of the pipe
insulation sleeves.
Remove the putty.
5
6
Cut off the clamps and
pull out the electronic
expansion valve coils.
24
Procedure
Sealing material
Electronic
expansion
valve coils
for room A
for room B
for room C
Clamp
(R12994)
(Q0513)
(R12993)
Clamp
(Q0528)
Si181296_A
Points
(Q0529)
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents