Daikin RMKS112LV1A Service Manual page 18

11.2/14.0/16.0 kw class 48000 btu/h class
Table of Contents

Advertisement

Outdoor Unit
Step
6
Heat up and disconnect
the brazed part of the
electronic expansion
valve.
7
Heat up and disconnect
the brazed part of the
high pressure switch.
8
Heat up and disconnect
the brazed parts of the
solenoid valve.
16
Procedure
Brazed part
High pressure switch
Solenoid valve for
hot gas bypass
Solenoid valve for unloading
Electronic
expansion valve
(main)
Electronic
expansion valve
(subcooling)
(R12981)
(R13062)
(R12983)
(R12984)
Si181296_A
Points
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents