PM SERIES
3 INSTALLATION
3.1 Unpack Checking
1. Don't lean the UPS when moving it out from the packaging
2. Check the appearance to see if the UPS is damaged or not during the transportation, do not
switch on the UPS if any damage found. Please contact the dealer right away.
3. Check the accessories according to the packing list and contact the dealer in case of missing
parts.
3.2 The Appearance of the Product
200kVA cabinet:
Front View
UDD-SD-125/ Release Date: 20.01.2015/Rev No: 0/Rev.
Side View
Date
:
Rear View
7