Cable Connections; Cable Connections - Integrated Configuration - Husky Altanium Neo5 User Manual

Table of Contents

Advertisement

Neo5 Main Power Switch - Freestanding Configuration (Single Stack)

15.2 Cable Connections

Depending on the Neo5 configuration, there will be cable connections at the back and front
of the controller.
The insulation level of control cables and devices connected to the Neo5 connectors are:
15.2.1 Cable Connections — Integrated Configuration
Page 134
500V when the devices are powered by a 380VAC or 415VAC system
300V when the devices are powered by a system up to 240VAC.
Cable Connections - Front of Neo5
v 1.0 — August 2018
Altanium Neo5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents