Before Cultivation

8 Before Cultivation

8.1 Preparing and Autoclaving the Culture Vessel

8.1.1

Checking Gaskets (O-Rings)

Page 74 of 214
The following chapters describe all the preparatory work before
starting the cultivation process. This essentially comprises:
Preparing and autoclaving the culture vessel:
Checking the gaskets (O-rings) on component parts and
culture vessel
Mounting component parts
Filling or moistening the culture vessel
Preparing sensors and other accessories
Autoclaving
Connecting the culture vessel and preparing for cultivation:
Hanging the culture vessel into place on the basic unit
and connecting cables and hoses between the culture
vessel and the equipment
Filling the vessel if necessary
Preparing sensors and other accessories
All accessories required for later cultivation must be prepared and
mounted accordingly and autoclaved together with the culture ves-
sel.
Certain accessories are already mounted when the equpment is
delivered.
O-rings are used to seal all openings on the vessel and top plate.
The top plate and all internal fittings or connections are thus
equipped with O-rings. Before every use, the O-rings must be
checked that they are present, undamaged and correctly seated.
Damaged O-rings must be replaced.
INFORMATION
Wet the O-rings with 70% alcohol or a little water to facilitate re-
moving and replacing O-rings or component parts with O-rings.
Do not use silicone grease; this can affect sterilisation results.
Carry out this check as follows:
07 February 2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Minifors 2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF