Connecting The Culture Vessel And Preparing The Cultivation; Hang The Culture Vessel In Place And Fit The Pump Heads; Filling The Reagent Hoses - Infors HT Minifors 2 Operating Manual

Benchtop bioreactor
Hide thumbs Also See for Minifors 2:
Table of Contents

Advertisement

8.2 Connecting the Culture Vessel and Preparing the Cultivation

8.2.1

Hang the Culture Vessel in Place and Fit the Pump Heads

Procedure
8.2.2

Filling the Reagent Hoses

07 February 2019
As soon as the culture vessel with the accessories has cooled suf-
ficiently, it can be hung up within the basic unit and the various ca-
ble and tube connections between the basic unit and the culture
vessel can be established.
Proceed as follows:
1.
Hang the vessel holder into place on the two hooks on the
thermal block adapter.
2.
Pull off the mounting plate with the pump heads from the
pump holder
3.
If necessary, flip up the pump cover plate.
4.
Plug the mounting plate with the pump heads onto the pump
motor drive shafts and close the cover plate.
In order to prepare the reagent hoses for operation, you must use
the Fill function on the operating panel to fill up with reagent via
the correct pump.
Before filling, remove the clamps from the reagent hoses.
Minifors 2 - Benchtop Bioreactor
Before Cultivation
Page 101 of 214

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Minifors 2 and is the answer not in the manual?

Table of Contents

Save PDF