Engine Installation Checklist - Lycoming TEO-540-A1A Installation And Operation Manual

Table of Contents

Advertisement

Engine Installation Checklist

Requirement
Make sure the engine is securely installed on the
engine mounts. Make sure that the hardware that
attaches the engine to the engine mounts is torqued
as per the airframe manufacturer's specified torque
values.
Make sure the power control linkage is connected.
Make sure all ground straps are connected to the
engine mounts.
Make sure the accessories and alternators are
installed.
Make sure all spark plugs are installed.
Make sure all wiring harnesses and wiring
connections have been made.
Make sure the wiring harness and sensors are
attached to the engine.
Make sure the ECU and Power Box are installed.
Make sure baffles have been installed.
Make sure fuel hoses and oil hoses are connected
and that there are no leaks. Make sure clamps are
securely installed on the fuel hoses.
Make sure oil has been added to engine and the oil
quantity added is recorded to calculate oil
consumption.
Make sure the engine pre-oil procedure has been
completed.
Make sure fuel has been added to aircraft fuel tanks.
Make sure the rpm measurements have been made.
WARNING TO PREVENT CATASTROPHIC FAILURE FROM FOREIGN OBJECT
DEBRIS (FOD), MAKE SURE THAT THERE ARE NO TOOLS IN THE
ENGINE NACELLE AND COMPARTMENT.
Remove any tools or unwanted materials from the
engine compartment.
Close the engine compartment.
Engine Installation
Page 42
TEO-540-A1A Engine Installation and Operation Manual
Engine Installation Checklist
© 2018 Avco Corporation. All Rights Reserved
Done
Comment
October 2018

Advertisement

Table of Contents
loading

Table of Contents