TEO-540-A1A Engine Installation and Operation Manual
Engine Installation Overview
NOTICE: All requirements identified in the chapter "Requirements for Engine Installation" must
be completed before engine installation.
To install the engine, refer to Table 1 and the section reference in this chapter for each step.
Step
Section References in This Chapter
1
Install the ECU
2
Install the Power Box
3
Install the Engine on Mounts
4
Connect the Wiring Harnesses
5
Connect the Power Control Linkage
6
Install External Accessories
7
Install the Alternators
8
Install the Propeller
9
Connect the Fuel Hoses
10
Connect the Oil Hoses
11
Attach Ground Straps
12
Install Components That Had Been Removed Before Engine Installation
and Any Additional Ship Loose Components
13
Make Remaining Engine Connections
14
Install Baffling
15
Add Oil
16
Engine Pre-Oil Procedure
17
Add Fuel (to aircraft as necessary)
18
Make RPM Measurements
19
Final Installation Inspection
20
Close Engine Compartment
© 2018 Avco Corporation. All Rights Reserved
October 2018
ENGINE INSTALLATION
Table 1
Engine Installation Steps and References
Engine Installation
Page 33