Requirements For Engine Installation; Overview; Step 1. Prepare The Engine; Prerequisites For Engine Installation - Lycoming IO-360-N1A Installation And Operation Manual

Table of Contents

Advertisement

IO-360-N1A Engine Installation and Operation Manual

Overview

NOTICE: All requirements identified in this chapter must be completed before the engine can be
installed. These requirements are for a new, rebuilt or stored engine to be placed into
service.
As an overview Table 1 identifies the necessary steps that must be done before the engine can be
installed.

Step 1. Prepare the Engine

To prepare a new, rebuilt, or overhauled engine
To prepare an engine that has been in storage
Prepare a New, Rebuilt, or Overhauled Engine for Installation
NOTICE: The engine is sent from the factory with preservative oil in the cylinders and in the
crankcase. A preservation date stamp (usually on the engine box) identifies the date this
oil was added and preservation is good for 60 days afterward. If an intake valve was
open, the preservative oil can get into the induction system of the engine. All
preservative oil must be removed per this procedure.
To prepare the new, rebuilt, or overhauled engine for installation in the airframe:
DO NOT TURN THE CRANKSHAFT OF AN ENGINE WITH
PRESERVATIVE OIL BEFORE REMOVAL OF THE BOTTOM SHIPPING
OR SPARK PLUGS. OTHERWISE, ENGINE DAMAGE, CAUSED BY
HYDRAULIC LOCK CAN OCCUR.
1. Lift the engine. Refer to the section "Lift the Engine" in the "Engine Reception and Lift" chapter
in this manual.
2. Complete the preservative oil removal procedure as follows:
A. If any of the dehydrator plugs (which contain crystals of silica gel) break and the crystals fall
into the engine, complete the following per the IO-360-N1A Engine Maintenance Manual.
 Disassemble the affected portion of the engine.
 Clean the engine.
© 2016 Avco Corporation. All Rights Reserved
February 2016

REQUIREMENTS FOR ENGINE INSTALLATION

Prerequisites for Engine Installation

Step
Section References in This Chapter
1
Prepare the Engine
2
Supply Interface Items
3
Remove Components
4
Install Aircraft-Supplied Engine Mounts
5
Prepare the Aircraft Engine Harness
6
Make Electrical Interface Connections
Table 1
Refer to the section "Prepare a New, Rebuilt, or
Overhauled Engine for Installation" in this
chapter.
Refer to the section "Prepare a Stored Engine
for Installation" in this chapter.
Requirements for Engine Installation
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents