3.3 CONNECTION OF SEVERAL BOLLARDS (MASTER/SLAVE)

Several bollards can be commanded simultaneously by connecting them together with the corresponding JE275 equipment in MASTER-
SLAVE configuration. Follow the indications below for correct wiring and operation.