Connecting Several Bollards (Master/Slave) - FAAC J355 HA M50 EFO Manual

Table of Contents

Advertisement

3.4 CONNECTING SEVERAL BOLLARDS (MASTER/SLAVE)

You can operatemore than one bollard simultaneously, and these can be interconnected using the corresponding JE275 device in the MASTER-
SLAVE configuration. Follow the following guidelines for proper wiring and operation of the devices.
JE275 MASTER
1.
F
2.
+
+
F
 10 s
3.
+
+
F
1
2 3
4
5 6
7
8
9
J1
1
JE275
MASTER
www.FastGateOpeners.com | (800) 878-7829 | Sales@FastGateOpeners.com
dF
06
=
+
-
F
o 1
1 1
=
P1
no
=
o 2
12
=
P2
no
=
+
-
F
b6
Y
=
+
-
F
10 11
12 13
14
15
16 17
18
19
JE275
SLAVE
JE275 SLAVE
dF
1.
F
LO
 10 s
03
3.
+
+
F
LO
F
4.
1
2
3
4
5
6
7
8
J1
2
JE275
SLAVE
A A
06
=
C
=
+
-
F
Y
=
+
-
F
Cu
=
+
-
F
9
10
11
12
13
14
15
16 17
18
n
16
19

Advertisement

Table of Contents
loading

Table of Contents