Startup Procedure; Bat-F; Bat-Rail - Hirschmann BAT series User Manual

Installation dual-band industrial access point / client / access bridge
Table of Contents

Advertisement

2.14

Startup procedure

2.14.1

BAT-F

Connecting the voltage supply via the 5-pin M12 connector or via the LAN
cable (Power over Ethernet) starts the operation of the device.
2.14.2

BAT-Rail

Connecting the voltage supply via the terminal block
 Pull the terminal block off the device and connect the voltage supply
lines.
 Mount the terminal block for the supply voltage on the front of the
device.
Connecting the voltage supply via the terminal block starts the operation
of the device.
Connecting the voltage supply via PoE
 Alternatively, you can supply the device with the PoE supply voltage
via the LAN cable as described above
Ethernet (PoE) - power supply via the LAN
Connecting the voltage supply via PoE starts the operation of the device.
2.15
Configuring devices
Apply power to the device before starting the configuration.
Switch devices can be configured in the following ways (if the model is
equipped with the corresponding interface):
Via the wire-bound local area network (LAN).
Via the radio network (WLAN), if the WLAN encryption (e.g. WPA2) in a
device with a wireless interface and in the configuration computer is set
respectively.
Via the serial configuration interface.
Refer to the "User Manual Basic Configuration" on the CD/DVD for more
details.
50
(see on page 45 "Power over
cable").
Installation BAT
Release 05 03/2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bat54-f singleBat54-fBat54-f clientBat54-railBat54-rail singleBat54-rail client ... Show all

Table of Contents