Monitoring Of Test Equipment; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN EOC 6K-3 Operating Manual

Industrial scales
Hide thumbs Also See for EOC 6K-3:
Table of Contents

Advertisement

3.4 Monitoring of Test Equipment

In the framework of quality assurance the measuring-related properties of the
balance and, if applicable, the testing weight, must be checked regularly. The
responsible user must define a suitable interval as well as type and scope of this
test.
In KERN's accredited DKD calibration laboratory test weights and
balances may be calibrated (return to the national standard) fast and at moderate
cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN
balances.

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

5 Transport and storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

5.2 Packaging / return transport

Keep all parts of the original packaging for a possibly
required return.
Only use original packaging for returning.
Prior to dispatch disconnect all cables and remove
loose/mobile parts.
Reattach possibly supplied transport securing devices.
Secure all parts such as the glass wind screen, the
weighing platform, power unit etc. against shifting and
damage.
EOC-BA-e-1711
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents