3) Assembly:
Fig. 3.1
Fig. 3.2
Fig. 3.3
INSTALLATION GUIDE
3.1.1) Locate final location of base
3.1.2) Set base in desired location and using marker,
trace hole location and mark perimeter for carpet
removal if needed
3.2.1) Set base over marked hole locations.
Note: Check that base is oriented as desired
3.2.2) Using a utility knife, cut away any carpet around
the base location
3.2.3) With carpet removed, double-check hole
locations and if not already there, re-mark hole
locations if needed.
Note: Hold the marker vertically and
spin the marker around the hole to get
the best result.
3.3.1) Measure 2 ¾" from the bottom of the ½"
diameter concrete drill bit and wrap drill bit with
tape creating a visual depth gauge.