Lifting Points
To determine the required lifting cable lengths and whether
four-or six-point lifting is required, use Tables 8 and 9 and
Figures 33 and 34.
Referring to Figure 33 and Figure 34, note that dimension A is
the distance between the outer lifting points. The four outer
rigging cables must be equal to or longer than dimension A.
Dimension B shows the minimum distance between the outer
and the inner lifting points for six-point lifting. Use this to
roughly determine the required length of the middle cables for
six-point lifting. Determine dimension A by subtracting
dimensions X and Y from dimension Z (e.g., A = Z – X – Y).
Table 8: X dimension (Figure 33 and Figure 34)
Outdoor/return air section
100 O.A.
Plenum
0–30% O.A.
0–100% economizer
0–100% economizer with 15" return fan
0–100% economizer with 30" return fan
0–100% economizer with 40" return fan
0–100% economizer with return fan
Table 9: Y dimension (Figure 33 and Figure 34)
RPS unit size
015C–030C
036C & 040C
045C–090C
105C
115C–135C
IM 738-2
015C–030C
in
mm
0
0
40
1016
40
1016
40
1016
62
1575
52
1321
Dimension Y
49.5" (1257 mm)
38.2" (970 mm)
39.5" (1003 mm)
30.5" (775 mm)
39.5'" (1003 mm)
Mechanical Installation: Rigging and Handling
Where:
Z = Total unit length in inches
(refer to certified drawings for this dimension).
X = Outdoor/return air section length (refer to Table 8for this
dimension).
Y = Refer to Table 9 for this dimension (see Figure 33 and
Figure 34).If A ≤ 288" (7315 mm), 4-point lifting is sufficient.
If A > 288" (7315 mm), 6-point lifting is required.
036C–040C
045C–075C
in
mm
in
0
0
0
52
1321
48
52
1321
48
52
1321
72
52
1321
80
2032
72
Figure 33. Unit type RPS/RDT lifting points
080C–135C
mm
in
mm
0
0
0
1259
72
1829
1259
72
1829
1829
96
2438
1829
96
2438
27